--- 產(chǎn)品詳情 ---
FET | External |
Vin (Min) (V) | 3 |
Vin (Max) (V) | 13 |
Vabsmax_cont (V) | 15 |
Current limit (Min) (A) | 0.01 |
Current limit (Max) (A) | 500 |
Overcurrent response | Circuit breaker, Current limiting |
Fault response | Latch-off |
- Dual-Channel High-Side MOSFET Drivers
- IN1: 3 V to 13 V; IN2: 3 V to 5.5 V
- Output dV/dt Control Limits Inrush Current
- Circuit-Breaker With Programmable Overcurrent
Threshold and Transient Timer - Power-Good Reporting With Transient Filter
- CMOS- and TTL-Compatible Enable Input
- Low, 5-μA Standby Supply Current?.(Max)
- Available in 20-Pin TSSOP Package
- –40°C to 85°C Ambient Temperature Range
- Electrostatic Discharge Protection
The TPS2310 and TPS2311 are dual-channel hot-swap controllers that use external N-channel MOSFETs as high-side switches in power applications. Features of these devices, such as overcurrent protection (OCP), inrush current control, output-power status reporting, and the ability to discriminate between load transients and faults, are critical requirements for hot-swap applications.
The TPS2310/11 devices incorporate undervoltage lockout (UVLO) and power-good (PG) reporting to ensure the device is off at start-up and confirm the status of the output voltage rails during operation. Each internal charge pump, capable of driving multiple MOSFETs, provides enough gate-drive voltage to fully enhance the N-channel MOSFETs. The charge pumps control both the rise times and fall times (dv/dt) of the MOSFETs, reducing power transients during power up/down. The circuit-breaker functionality combines the ability to sense overcurrent conditions with a timer function; this allows designs such as DSPs, that may have high peak currents during power-state transitions, to disregard transients for a programmable period.
DISCH1, DISCH2–DISCH1 and DISCH2 should be connected to the sources of the external N-channel MOSFET transistors connected to GATE1 and GATE2, respectively. These pins discharge the loads when the MOSFET transistors are disabled. They also serve as reference-voltage connections for internal gate voltage-clamp circuitry.
ENABLE or ENABLE–ENABLE for TPS2310 is active-low. ENABLE for TPS2311 is active-high. When the controller is enabled, both GATE1 and GATE2 voltages will power up to turn on the external MOSFETs. When the ENABLE pin is pulled high for TPS2310 or the ENABLE pin is pulled low for TPS2311 for more than 50 μs, the gate of the MOSFET is discharged at a controlled rate by a current source, and a transistor is enabled to discharge the output bulk capacitance. In addition, the device turns on the internal regulator PREREG (see VREG) when enabled and shuts down PREREG when disabled so that total supply current is less than 5 μA.
FAULT –FAULT is an open-drain overcurrent flag output. When an overcurrent condition in either channel is sustained long enough to charge TIMER to 0.5 V, both channels latch off and pull this pin low. In order to turn the device back on, either the enable pin has to be toggled or the input power has to be cycled.
GATE1, GATE2– GATE1 and GATE2 connect to the gates of external N-channel MOSFET transistors. When the device is enabled, internal charge-pump circuitry pulls these pins up by sourcing approximately 15 μA to each. The turnon slew rates depend upon the capacitance present at the GATE1 and GATE2 terminals. If desired, the turnon slew rates can be further reduced by connecting capacitors between these pins and ground. These capacitors also reduce inrush current and protect the device from false overcurrent triggering during powerup. The charge-pump circuitry generates gate-to-source voltages of 9?V–12?V across the external MOSFET transistors.
IN1, IN2– IN1 and IN2 should be connected to the power sources driving the external N-channel MOSFET transistors connected to GATE1 and GATE2, respectively. The TPS2310/TPS2311 draws its operating current from IN1, and both channels remains disabled until the IN1 power supply has been established. The IN1 channel has been constructed to support 3-V, 5-V, or 12-V operation, while the IN2 channel has been constructed to support 3-V or 5-V operation
ISENSE1, ISENSE2, ISET1, ISET2–ISENSE1 and ISENSE2, in combination with ISET1 and ISET2, implement overcurrent sensing for GATE1 and GATE2. ISET1 and ISET2 set the magnitude of the current that generates an overcurrent fault, through external resistors connected to ISET1 and ISET2. An internal current source draws 50 μA from ISET1 and ISET2. With a sense resistor from IN1 to ISENSE1 or from IN2 to ISENSE2, which is also connected to the drains of external MOSFETs, the voltage on the sense resistor reflects the load current. An overcurrent condition is assumed to exist if ISENSE1 is pulled below ISET1 or if ISENSE2 is pulled below ISET2. To ensure proper circuit breaker operation, VI(ISENSE1) and VI(ISET1) should never exceed VI(IN1). Similarly, VI(ISENSE2) and VI(ISET2) should never exceed VI(IN2).
PWRGD1, PWRGD2–PWRGD1 and PWRGD2 signal the presence of undervoltage conditions on VSENSE1 and VSENSE2, respectively. These pins are open-drain outputs and are pulled low during an undervoltage condition. To minimize erroneous PWRGDx responses from transients on the voltage rail, the voltage sense circuit incorporates a 20-μs deglitch filter. When VSENSEx is lower than the reference voltage (about 1.23 V), PWRGDx is active low to indicate an undervoltage condition on the power-rail voltage. PWRGDx may not correctly report power conditions when the device is disabled, because there is no gate drive power for the PWRGD output transistor in the disable mode, or, in other words, PWRGD is floating. Therefore, PWRGD is pulled up to its pullup power supply rail in disable mode.
TIMER–A capacitor on TIMER sets the time during which the power switch can be in overcurrent before turning off. When the overcurrent protection circuits sense an excessive current, a current source is enabled which charges the capacitor on TIMER. Once the voltage on TIMER reaches approximately 0.5 V, the circuit-breaker latch is set and the power switch is latched off. Power must be recycled or the ENABLE pin must be toggled to restart the controller. In high-power or high-temperature applications, a minimum 50-pF capacitor is strongly recommended from TIMER to ground, to prevent any false triggering.
VREG–VREG is the output of an internal low-dropout voltage regulator, where IN1 is the input. The regulator is used to generate a regulated voltage source, less than 5.5 V, for the device. A 0.1-μF ceramic capacitor should be connected between VREG and ground to aid in noise rejection. In this configuration, upon disabling the device, the internal low-dropout regulator will also be disabled, which removes power from the internal circuitry and allows the device to be placed in low-quiescent-current mode. In applications where IN1 is less than 5.5 V, VREG and IN1 may be connected together. However, under these conditions, disabling the device does not place the device in low-quiescent-current mode, because the internal low-dropout voltage regulator is being bypassed, thereby keeping internal circuitry operational. If VREG and IN1 are connected together, a 0.1-μF ceramic capacitor between VREG and ground is not needed if IN1 already has a bypass capacitor of 1 μF to 10μF.
VSENSE1, VSENSE2–VSENSE1 and VSENSE2 can be used to detect undervoltage conditions on external circuitry. If VSENSE1 senses a voltage below approximately 1.23 V, PWRGD1 is pulled low. Similarly, a voltage less than 1.23 V on VSENSE2 causes PWRGD2 to be pulled low.
為你推薦
-
TI數(shù)字多路復(fù)用器和編碼器SN54HC1512022-12-23 15:12
-
TI數(shù)字多路復(fù)用器和編碼器SN54LS1532022-12-23 15:12
-
TI數(shù)字多路復(fù)用器和編碼器CD54HC1472022-12-23 15:12
-
TI數(shù)字多路復(fù)用器和編碼器CY74FCT2257T2022-12-23 15:12
-
TI數(shù)字多路復(fù)用器和編碼器SN74LVC257A2022-12-23 15:12
-
TI數(shù)字多路復(fù)用器和編碼器SN74LVC157A2022-12-23 15:12
-
TI數(shù)字多路復(fù)用器和編碼器SN74ALS258A2022-12-23 15:12
-
TI數(shù)字多路復(fù)用器和編碼器SN74ALS257A2022-12-23 15:12
-
TI數(shù)字多路復(fù)用器和編碼器SN74ALS157A2022-12-23 15:12
-
TI數(shù)字多路復(fù)用器和編碼器SN74AHCT1582022-12-23 15:12
-
如何利用運(yùn)算放大器設(shè)計(jì)振蕩電路?2023-08-09 08:08
使用運(yùn)算放大器設(shè)計(jì)振蕩電路運(yùn)算放大器的工作原理發(fā)明運(yùn)算放大器的人絕對(duì)是天才。中間兩端接上電源,當(dāng)同相輸入大于反相輸入,右側(cè)就會(huì)輸出(接近)電源電壓(Vcc),如果反過(guò)來(lái)小于同相輸入,則輸出0V(負(fù)電源)電壓。在輸出端接上燈泡,假設(shè)我想控制燈泡循環(huán)亮滅,那就需要一會(huì)輸出高電平點(diǎn)亮,一會(huì)輸出低電平熄滅。也就是我需要讓左邊能自動(dòng)變化大小,就能實(shí)現(xiàn)控制燈泡。如何讓電2089瀏覽量 -
【PCB設(shè)計(jì)必備】31條布線技巧2023-08-03 08:09
相信大家在做PCB設(shè)計(jì)時(shí),都會(huì)發(fā)現(xiàn)布線這個(gè)環(huán)節(jié)必不可少,而且布線的合理性,也決定了PCB的美觀度和其生產(chǎn)成本的高低,同時(shí)還能體現(xiàn)出電路性能和散熱性能的好壞,以及是否可以讓器件的性能達(dá)到最優(yōu)等。在上篇內(nèi)容中,小編主要分享了PCB線寬線距的一些設(shè)計(jì)規(guī)則,那么本篇內(nèi)容,將針對(duì)PCB的布線方式,做個(gè)全面的總結(jié)給到大家,希望能夠?qū)︷B(yǎng)成良好的設(shè)計(jì)習(xí)慣有所幫助。1走線長(zhǎng)度1690瀏覽量 -
電動(dòng)汽車(chē)直流快充方案設(shè)計(jì)【含參考設(shè)計(jì)】2023-08-03 08:08
大功率直流充電系統(tǒng)架構(gòu)大功率直流充電設(shè)計(jì)標(biāo)準(zhǔn)國(guó)家大功率充電標(biāo)準(zhǔn)“Chaoji”技術(shù)標(biāo)準(zhǔn)設(shè)計(jì)目標(biāo)是未來(lái)可實(shí)現(xiàn)電動(dòng)汽車(chē)充電5分鐘行駛400公里?!癈haoji”技術(shù)標(biāo)準(zhǔn)主要設(shè)計(jì)參數(shù)如下:最大電壓:目前1000V(可擴(kuò)展到1500V);最大電流:帶冷卻系統(tǒng)500A(可擴(kuò)展到600A);不帶冷卻系統(tǒng)150-200A;最大功率:900KW。大功率直流充電系統(tǒng)架構(gòu)大功率3641瀏覽量 -
Buck電路的原理及器件選型指南2023-07-31 22:28
Buck電路工作原理電源閉合時(shí)電壓會(huì)快速增加,當(dāng)斷開(kāi)時(shí)電壓會(huì)快速減小,如果開(kāi)關(guān)速度足夠快的話,是不是就能把負(fù)載,控制在想要的電壓值以內(nèi)呢?假設(shè)12V降壓到5V,也就意味著,MOS管開(kāi)關(guān)需要42%時(shí)間導(dǎo)通,58%時(shí)間斷開(kāi)。當(dāng)42%時(shí)間MOS管導(dǎo)通時(shí),電感被充磁儲(chǔ)能,同時(shí)對(duì)電容進(jìn)行充電,給負(fù)載提供電量。當(dāng)58%時(shí)間MOS管斷開(kāi)時(shí),由于電感上的電流不能突變,電路通 -
100W USB PD 3.0電源2023-07-31 22:27
什么是PD3.0快充?PD快充協(xié)議全稱(chēng)“USBPowerDelivery”功率傳輸協(xié)議,簡(jiǎn)稱(chēng)為“PD協(xié)議”。2015年11月,USBPD快充迎來(lái)了大版本更新,進(jìn)入到了USBPD3.0快充時(shí)代。USBPD3.0相對(duì)于USBPD2.0的變化主要有三方面:增加了對(duì)設(shè)備內(nèi)置電池特性更為詳細(xì)的描述;增加了通過(guò)PD通信進(jìn)行設(shè)備軟硬件版本識(shí)別和軟件更新的功能,以及增加了數(shù) -
千萬(wàn)不要忽略PCB設(shè)計(jì)中線寬線距的重要性2023-07-31 22:27
想要做好PCB設(shè)計(jì),除了整體的布線布局外,線寬線距的規(guī)則也非常重要,因?yàn)榫€寬線距決定著電路板的性能和穩(wěn)定性。所以本篇以RK3588為例,詳細(xì)為大家介紹一下PCB線寬線距的通用設(shè)計(jì)規(guī)則。要注意的是,布線之前須把軟件默認(rèn)設(shè)置選項(xiàng)設(shè)置好,并打開(kāi)DRC檢測(cè)開(kāi)關(guān)。布線建議打開(kāi)5mil格點(diǎn),等長(zhǎng)時(shí)可根據(jù)情況設(shè)置1mil格點(diǎn)。PCB布線線寬01布線首先應(yīng)滿足工廠加工能力,1781瀏覽量 -
基于STM32的300W無(wú)刷直流電機(jī)驅(qū)動(dòng)方案2023-07-06 10:02
如何驅(qū)動(dòng)無(wú)刷電機(jī)?近些年,由于無(wú)刷直流電機(jī)大規(guī)模的研發(fā)和技術(shù)的逐漸成熟,已逐步成為工業(yè)用電機(jī)的發(fā)展主流。圍繞降低生產(chǎn)成本和提高運(yùn)行效率,各大廠商也提供不同型號(hào)的電機(jī)以滿足不同驅(qū)動(dòng)系統(tǒng)的需求?,F(xiàn)階段已經(jīng)在紡織、冶金、印刷、自動(dòng)化生產(chǎn)流水線、數(shù)控機(jī)床等工業(yè)生產(chǎn)方面應(yīng)用。無(wú)刷直流電機(jī)的優(yōu)點(diǎn)與局限性優(yōu)點(diǎn):高輸出功率、小尺寸和重量、散熱性好、效率高、運(yùn)行速度范圍寬、低943瀏覽量 -
上新啦!開(kāi)發(fā)板僅需9.9元!2023-06-21 17:43
上新啦!開(kāi)發(fā)板僅需9.9元!2258瀏覽量 -
參考設(shè)計(jì) | 2KW AC/DC數(shù)字電源方案2023-06-21 17:43
什么是數(shù)字電源?數(shù)字電源,以數(shù)字信號(hào)處理器(DSP)或微控制器(MCU)為核心,將數(shù)字電源驅(qū)動(dòng)器、PWM控制器等作為控制對(duì)象,能實(shí)現(xiàn)控制、管理和監(jiān)測(cè)功能的電源產(chǎn)品。它是通過(guò)設(shè)定開(kāi)關(guān)電源的內(nèi)部參數(shù)來(lái)改變其外特性,并在“電源控制”的基礎(chǔ)上增加了“電源管理”。所謂電源管理是指將電源有效地分配給系統(tǒng)的不同組件,最大限度地降低損耗。數(shù)字電源的管理(如電源排序)必須全部 -
千萬(wàn)不能小瞧的PCB半孔板2023-06-21 17:34